
New pool
Mona Vale · June 2025
New pool and spa in Mona Vale
A new pool and attached spa with water blades falling from a herringbone marble wall.
Licensed pool builder · Sydney City
We build spas in Sydney City: attached to a new pool, where the spa spills into the pool, or standalone where there isn’t room for both.

Spa construction
Add photos if you can. We usually reply within one business day.
Spa construction
For a new spa in Sydney City, we shape it to the space, with the seats, jets and spill edge planned with you. Send a few photos of the area for a free quote.
A spa is formed and finished like the pool, so it matches the interior, the tiles and the coping, and it can sit at any height: flush with the paving, raised so it spills into the pool, or set into a feature wall.

Our work
Recent jobs of ours from across Sydney.
Why Superior
Superior Pools & Spas started in 2024, built on more than 15 years of building and renovating pools. Our NSW Contractor Licence covers swimming pool building and wall and floor tiling, so the same business shapes the pool, lays its interior and sets every tile. Builders bring us in for the pools on their projects too.

Google reviews
Word for word from our Google reviews, with the date each was posted.
5.0 out of 5from 29 Google reviews
Your options
Attached to the pool or on its own, flush with the paving or raised with a spill edge.
Local know-how
In Sydney City, pools are mostly in terraces, courtyards and apartment buildings. Strata pools and spas, small courtyard plunge pools and renovations of older shells are the usual jobs.
Work in a strata building is planned with the committee or building manager: access, hours, lifts and the paperwork.
A courtyard plunge pool needs the tightest access planning and careful work beside boundary walls.
Many terraces are heritage items or in conservation areas, which shapes the approval.
Suburbs we cover: 25 · See every suburb
Typical prices
Market ranges for the same work across Sydney, which hold in Sydney City too, so you know roughly where your job sits before we quote. The guide explains what moves the price up or down.
Questions
What people ask us about spa construction before they book.
Usually with a gas heater or a heat pump. Gas heats quickly for occasional use; a heat pump costs less to run for regular use.
An attached spa usually shares the pool's filter and plumbing, with its own jets and heating. A standalone spa needs its own equipment.
Often, if there is room beside the pool and the structure and equipment allow it. It needs an inspection of the pool first, and usually approval.
Usually 4 to 8 weeks on site once the approval is through: about 4 to 6 for a standalone spa and 6 to 8 for one built with a pool. Rock, tight access and wet weather can add time.
Where we work
Every suburb we cover here, our other services in the area, and the same work in the other regions we cover.
Get a free quote
Send a few details and photos of your pool or yard. Quotes are free, and we usually reply within one business day.
5.0 out of 5from 29 Google reviews